House Painting and repair 1913 Seattle Home

Read owner Elizabeth Franklin’s Angie’s List Review for this project

This 1913 built Seattle home in Mt. Baker was a major restoration project in addition to the house painting and prep. No less than 175 hours of carpentry repair was performed to prepare the building for painting. Cellular PVC was selected to be used on the third deck railing where the entire structure was unsound and needed to be removed and replaced. Many of the old fascia and post details were discovered to be rotten after work had begun. Many of the old details needed to be custom designed and assembled off site at the Shearer Painting shop before field installation.

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

©2017 Shearer Painting -  Master Certified Fine Paints of Europe, Seattle Historic Society, Work Place Platinum, Summit Saftey, FCA Contractor, BOMA Hero Award, EST. 1990

Log in with your credentials

or    

Forgot your details?

Create Account